Bring back both appliances after both appliances fail simultaneously by using the GUI

In this scenario, a massive power loss causes both the primary node and the standby node to fail. You must restart both nodes.

You can configure appliances for high availability by using the Amlen WebUI, or by using the command line. For more information about using the command line to configure appliances for high availability, see Bring back both appliances after both appliances fail simultaneously by using the command line. In this scenario, the content of the store and configuration of Appliance A is preserved.

  1. Power® on both appliances.

    If the server on one or both of the appliances does not start, check the logs for messages. For more information about the log files, see Log files.

  2. Verify that the server is running in production mode on both appliances.
    You can view the status of each appliance from the Status menu on the Amlen WebUI. You can view further information on the status of the appliance by using the System Control page.
  3. If either appliance is not running in production mode, check the logs for messages and resolve the problem.
    Depending on the nature of the problem, you might need to perform further action as described in High availability scenarios.
You can view further information about the high availability role of the appliance by using the High Availability page.